HOME CHARGING STATION SAFETY INSPECTION
Audit Code: AUD-006-INS

Purpose of Audit
The audit is conducted to assess the safety, technical suitability, and operational integrity of electric vehicle (EV) charging infrastructures. The audit aims to analyze fire, electrical, mechanical, and structural risks and identify improvement opportunities that support the safe operation of charging stations.
Scope of Audit
The system and documentation review includes checking electrical protection, grounding, IP rating, and cable connections, evaluating charging units and panels, examining fire protection systems, and reviewing accessibility and user safety. Field drills and emergency scenarios are also included in the assessment when necessary.
Method and Reporting
The audit is conducted through a site visit, desk analysis, and management interviews. Findings are reported in the form of a risk and non-compliance matrix, visualized field findings, technical recommendations, and a prioritized action plan. The results are shared with management in an interactive session.
Audit Period
Audit duration varies depending on the number of facilities, the scope of the system and the depth of analysis.
Which Organizations Is It For?
It's suitable for companies operating or installing electric vehicle charging infrastructure, energy distribution companies, building managements, shopping malls, municipalities, and industrial facilities. It's also preferred by organizations preparing for internal audits or certification processes in accordance with TS 13912 or relevant international standards.
Auditor Staff
The audit is conducted by Meganova's experienced lead auditors in electrical, fire, and technical safety. Experts from relevant engineering disciplines are also involved when necessary.
Reference Standards
TS 13912:2025, IEC 61851, IEC 62196, EN 60364-7-722, ISO 45001



